Item |
Main Facilities & Equipment |
Capacity |
Contruction |
Cutting shop |
20,700㎡ |
| Machinery shop |
5,400㎡ |
| Indoor assembly shop |
9,600㎡ |
| Outdoor assembly shop |
28,800㎡ |
| Substation |
1,400㎡ |
| Warehouse |
12,170㎡ |
| Blasting & Painting shop |
9,340㎡ |
| Machinery |
Plasma
CNC
Press |
5.2m/1torch x 3sets
4.8m/6 torch x 1set
4.8m/10 torch x 1set
1,500tons x 1set (Rolling)
700tons x 2sets
300tons x 1set
|
| Crane (Gentry crane & O/H crane) |
30 sets |
Transporter |
510tons x 1set
210tons x 1 set
100tons x 1set |
| Plant |
Electric facilities |
#1 TR 15,000kw
#2 TR 20,000kw |
| Air comp. system |
5,000CFM x 8sets |
| Gas facilities (Oxygen, Co2, Acetylene) |
Tank storage : 7ea |
|
 |
|
Category |
Area |
Base |
Equipment |
Enclosed Space
Hull Shop |
|
Steel Bed
Above
Concrete
Foundation |
Hydro Press Machine (700 Tons) x 1 set
Magnetic Overhead Crane (10 Tons) x 1 set
Overhead Crane(50 Tons) x 1 set |
| Open Space |
Steel Cutting Area |
10,000 M 2 |
Concrete
Foundatio |
30 Ton jib Crane x 1
Other necessary cranes and transportation means will be mobilized when necessary |
| Steel Cutting Area |
6,000 M 2 |
Concrete
Foundation |
30 Ton jib Crane x 1
Other necessary cranes and transportation means will be mobilized when necessary |
Pipe Fabrication Shop |
Concrete Foundation |
Hydro Test Pump (250 Bar)
N/C Pipe Coaster (Up to 600 A)
Pipe Bending Machine (Up to 150 A)
Welding Positions
High Speed Cutters
Welding Machines |
|
 |
|
 |
Dimension L x B x H = 15m x 9m x 4.5m |
 |
|
|
 |
Service Items |
|
No |
M/E & D/G |
No |
Control System |
Remark |
1 |
Fuel Valve |
1 |
M/E & D/G Governor O/H, Service |
|
2 |
Vit System |
2 |
Pneumatic System Service
(Nabco, Nakakita….) |
|
3 |
Reversing Mechanic |
3 |
Hydraulic System Service |
|
|
 |
Equipment List |
|
No |
M/E & D/G |
No |
Control System |
Remark |
1 |
Nozzle Tester |
1 |
Governor Testing M/C |
|
2 |
Fuel Valve Test Device |
2 |
Pneumatic Tester |
|
3 |
Lapping Nozzle M/C |
3 |
Hydraulic System Service |
|
4 |
Grinding M/C |
|
|
|
|
| |
 |
|
Area |
Base |
Equipment |
600M |
Concrete
Wood
Board |
Dimensions ( L x B x H ) : 20M x 30M x 10M
Capacity (Based on 30-40 HP Motor) : 30 Units/ Day
| Equipment in shop : |
 |
Drying Room |
 |
Super Cleaning Room |
|
|
 |
|
Area |
Base |
Equipment |
600 M |
Concrete |
|
|
Facilities |
Specification
(W x L x H) |
Q'ty |
Remark |
Pipe anti rust tank. |
7.5 M x 2.0 M x 2.0 M |
1 |
|
Heat exchanger Anti rust tank. |
7.5 M x 2.0 M x 2.0 M |
1 |
|
Degrease tank. |
7.5 M x 2.0 M x 2.0 M |
1 |
|
| Non Ferrous Material Anti rust tank. |
7.5 M x 2.0 M x 2.0 M |
1 |
|
| Neutral Ration Anti Rust Tank. |
7.5 M x 2.0 M x 2.0 M |
1 |
|
| T/C Rotor Anti Rust Tank. |
7.5 M x 2.0 M x 2.0 M |
1 |
|
| Jet washing machine |
Super - 2.0 |
2 |
|
| Transfer pump |
2M 3 /Min x 20MH x 17KW |
|
|
| EOTC |
5 Tons / AC 380V |
|
|
| Portable Boiler |
1 Ton |
1 set |
|
|
 |
Chemical Cleaning Capacity |
|
1 |
Main Engine Air Inter Cooler |
Bore 300 Low-901 High
Diesel Generator) |
2 |
Cooler Condenser |
50 M 2 Low - 401 M 2 High |
3 |
Heat (F.O, L.W, L.O) Type |
10 M 2 Low - 101 M 2 High |
4 |
M.E. Turbo Charger Rotor |
VTR 160 M 2 Low - 900 M 2 High |
5 |
M.E. Turbo Charger Casing |
VTR 160 M 2 Low - 900 M 2 High
(Turbine, Center Casing) |
6 |
Turbo Charger Nozzle Ring |
|
7 |
M.E. Cylinder Head |
Bore 500 M 2 Low - 1.001 M 2 High |
8 |
M.E. Scavenging Valve |
|
9 |
M.E. Turbo Charger Cylinder |
VTR 160 M 2 Low - 900 M 2 High |
10 |
M.E. Piston Liner |
Bore 500 M 2 Low - 1.001 M 2 High |
11 |
M.E. Piston Skirt |
Bore 500 M 2 Low - 1.001 M 2 High |
12 |
Pipe (New/Old) |
10A - Ever 300A |
|
| |
|
 |
|